Network diagram : Critical Path Identification

Need a network diagrma for the following table

Activity ID

Optimistic (O)

Most Likely (M)

Pessimistic (P)

Expected Time (TE)

Variance (σ²)

Standard Deviation (σ)

A

2

3

5

3.33

0.25

0.50

B

1

2

4

2.17

0.25

0.50

C

2

3

5

3.33

0.25

0.50

D

4

5

7

5.33

0.44

0.67

E

3

4

6

4.33

0.25

0.50

F

3

4

6

4.33

0.25

0.50

G

2

3

5

3.33

0.25

0.50

H

1

2

4

2.17

0.25

0.50

I

1

2

3

2.00

0.11

0.33

J

1

2

3

2.00

0.11

0.33