BN205 Project Management:Ethical Decision Making Framework

$20 Bonus + 25% OFF

Securing Higher Grades Costing Your Pocket?
Book Your Assignment at The Lowest Price
Now!

Students Who Viewed This Also Studied

BN205 Project Management

Question:

Ethical Decision Making Framework

Purpose

As a project manager, your career will be driven by decisions, often dozens or more per day. Some decisions are small and barely noticed while others are more prominent and could have serious ramifications on yourself, your organisation and your stakeholders. Decisions like this will most likely require deep thought as they involve people, resources and the environment. Sometimes these factors are in conflict, creating a dilemma and perhaps significant risks where your awareness of Ethical issues in a professional setting will be vital. 

To guide ethical behaviour and help with tough decisions, the Project Management Institute (PMI) has developed a Code of Ethics and Professional Conduct and an Ethical Decision-Making Framework. This assessment will require you to use your knowledge of the PMI code and framework and apply it in a real life case study. Assignment structure and submission guideline.

The assignment is divided into two parts:

• The first part of the assignment (1a) focuses on project management code of ethics theory and practice. Assignment 1a is worth 5% of the total unit marks. Students have to submit the first part of the assignment (assignment 1a) in week 3.

• The second part of the assignment (1b) is an extension on assignment 1a. It highlights the importance of risk identification and assessment while managing projects. Assignment 1b also emphasises how decision making in project management requires awareness of both ethical issues and risks that might affect people resources and the environment.

Assignment 1b is worth 10% of total unit marks. Once assignment 1a is marked feedback is provided, then students complete assignment 1b taking into account the feedback provided and submit.

Altex Corporation – Case Study

Background

Following World War II, the United States entered into a Cold War with Russia. To win this Cold War, the United States had to develop sophisticated weapon systems with such destructive power that any aggressor knew that the retaliatory capability of the United States could and would inflict vast destruction. Hundreds of millions of dollars were committed to ideas concerning technology that had not been developed as yet. Aerospace and defence contractors were growing without bounds, thanks to cost-pluspercentage-of-cost contract awards. Speed and technological capability were judged to be significantly more important than cost. To make matters worse, contracts were often awarded to the second or third most qualified bidder for the sole purpose of maintaining competition and maximizing the total number of defence contractors.

Contract Award

During this period Altex Corporation was elated when it learned that it had just been awarded the R&D phase of the Advanced Tactical Missile Program (ATMP). The terms of the contract specified that Altex had to submit to the Army, within 60 days after contract award, a formal project plan for the two-year ATMP effort. Contracts at that time did not require that a risk management plan be developed. A meeting was held with project manager of R&D to assess the risks in the ATMP effort. PM: “I’m in the process of developing the project plan. Should I also develop a risk management plan as part of the project plan?” Sponsor-: “Absolutely not! Most new weapon systems requirements are established by military personnel who have no sense of reality about what it takes to develop a weapon system based upon technology that doesn’t even exist yet. We’ll be lucky if we can deliver 60-70 percent of the specification imposed upon us.” PM: “But that’s not what we stated in our proposal. I wasn’t brought on board until after we won the award, so I wasn’t privileged to know the thought process that went into the proposal.

The proposal even went so far as to imply that we might be able to exceed the specification limits, and now you’re saying that we should be happy with 60-70 percent.” Sponsor: “We say what we have to say to win the bid. Everyone does it. It is common practice. Whoever wins the R&D portion of the contract will also be first in line for the manufacturing effort and that’s where the megabucks come from! If we can achieve 60-70 percent of specifications, it should placate the Army enough to give us a follow-on contract. If we told the Army the true cost of developing the technology to meet the specification limits, we would never get the contract. The program might even be cancelled.

The military people want this weapon system. They’re not stupid! They know what is happening and they do not want to go to their superiors for more money until later on, downstream, after approval by DoD and project kickoff. The government wants the lowest cost and we want long-term, follow-on production contracts, which can generate huge profits.”

PM: “The problem with letting your engineers and scientists be optimistic is that they become reactive rather than proactive thinkers. Without proactive thinkers, we end up with virtually no risk management or contingency plans. When problems surface that require significantly more in the way of resources than we budgeted for, we will be forced to accept crisis management as a way of life. Our costs will increase and that’s not going to make the Army happy.” Sponsor: “But the Army won’t penalize us for failing to meet cost or for allowing the schedule to slip. If we fail to meet at least 60-70 percent of the specification limits, however, then we may well be in trouble. The Army knows there will be a follow-on contract request if we cannot meet specification limits. I consider 60- 70 percent of the specifications to be the minimum acceptable limits for the Army.

The Army wants the program kicked off right now. “Another important point is that long-term contracts and follow-on production contracts allow us to build up a good working relationship with the Army. This is critical. Once we get the initial contract, as we did, the Army will always work with us for follow-on efforts. Whoever gets the R&D effort will almost always get the lucrative production contract. Military officers are under pressure to work with us because their careers may be in jeopardy if they have to tell their superiors that millions of dollars were awarded to the wrong defence contractor. From a career standpoint, the military officers are better off allowing us to downgrade the requirements than admitting that a mistake was made.” PM: “I’m just a little nervous managing a project that is so optimistic that major advances in the state of the art must occur to meet specifications.

This is why I want to prepare a risk management plan.” Sponsor “You don’t need a risk management plan when you know you can spend as much as you want and also let the schedule slip. If you prepare a risk management plan, you will end up exposing a multitude of risks, especially technical risks. The Army might not know about many of these risks, so why expose them and open up Pandora’s box’? Personally, I believe that the Army does already know many of these risks, but does not want them publicized to their superiors”. “If you want to develop a risk management plan, then do it by yourself, and I really mean by yourself. Past experience has shown that our employees will be talking informally to Army personnel at least two to three times a week. I don’t want anyone telling the customer that we have a risk management plan.

The customer will obviously want to see it, and that’s not good for us”. “If you are so incensed that you feel obligated to tell the customer what you’re doing, then wait about a year and a half. By that time, the Army will have made a considerable investment in both us and the project, and they’ll be locked into us for follow-on work. Because of the strategic timing and additional costs, they will never want to qualify a second supplier so late in the game. Just keep the risk management plan to yourself for now”. “If it looks like the Army might cancel the program, then we’ll show them the risk management plan, and perhaps that will keep the program alive.”

Assignment Tasks

Assignment 1a: Ethical Analysis of the case study Prepare a report of about 500 words that gives an ethical analysis of the issues raised in the case study. Your report should at least include the following: Executive Summary o You should provide a brief summary of your main findings and research so that the reader can know its main purpose. Introduction o In this section you should (briefly) state the case study being analysed.

You should also discuss the purpose and scope of the report and the sources of the information that you have used. Ethical Analysis of the case study o In this section you should identify the ethical issues of the case study and relevant requirement of PMI code related to case study.

Assignment 1b: Breach of PM Ethical Standard and Associated Risks Prepare a report of about 1000 words that on potential breach of PMI code of conduct and risks to the project.

Your report should at least include the following:

o Potential breaches of the Project Management Institute (PMI) ethical standards by the Project team.

o Consequences to the stakeholders of accepting this aggressive bid and risks involved in this project.

o Your recommendations to the project manager how to proceed to solve the ethical dilemma he is facing.

Conclusion:

Provide short concluding comments that remind the reader the main purpose of the assessment, how you went about addressing the ethical issues of the case study, what references you used and what the main findings were.

BN205 Project Management

Answer in Detail


Solved by qualified expert

Get Access to This Answer

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

43 More Pages to Come in This Document. Get access to the complete answer.

MyAssignmenthelp.com is every student’s favorite thesis paper help in Australia. Our combination of excellent thesis writing service and thesis writers is what makes us so popular among students. We provide high quality assistance to all those students who wonder, who can help me with my thesis paper’ and students can avail our thesis help services 24×7.

More BN205 BN205 Project Management: Questions & Answers

BSBLDR801 Lead Personal and Strategic Transformation

Assessment 3 has three compulsory parts (numbered 1, 2, and 3). As a guide,. You have the discretionary control as to how this word count is best allocated. Choose an organisation and research and develop a change project plan for a change initiative.The report must address all four requirements bel …

View Answer

IT301-Project Management

Purpose of the Assignment
A project plan consists of many artifacts that must be integrated, and which must support each other as outlined in the project management framework. Project integration management ensures that all artifacts are aligned and completed. If an artifact is not aligned, project …

View Answer

Management

Your work should include two parts. Part 1: Logical Automated Business Processing:  In the report part, you need to discuss: Assignment 2 Part 2 Analysing and Designing To-Be Business Process for  the case discussed in Assignment 2 Part 1   The benefits, drawbacks, risks and oppo …

View Answer

Business Management

Your project brief has been accepted by Senior Management and a design project has been formally commenced. You have been appointed as both Project Manager and Chief Designer for the project. Your tasks are to: 1.      Update your project brief with full details of …

View Answer

Content Removal Request

If you are the original writer of this content and no longer wish to have your work published on Myassignmenthelp.com then please raise the
content removal request.

Choose Our Best Expert to Help You

Kaelyn Flynn

Accounting – Ph.D. from the Abilene Christian University.

400 – Completed Orders

Hire Me

Still in Two Minds? The Proof is in Numbers!

38983 Genuine Reviews With a Rating of 4.9/5.

Assignment

Thesis: 8 Pages, Deadline:
2 days

I appreciate the hard work in this. I got a good grade and will be using this again. Thank you!

User ID: 8***19 Norfolk, United States

Statistics

Assignment: 0 Pages, Deadline:
2 days

Great work and fantastic job on completing the assignment. You did a wonderful job and I am thankful.

User ID: 4***64 Norfolk, United States

Psychology

Assignment: 2 Pages, Deadline:
16 days

thanks to reaching out fast. It’s well written and followed every details and instructions. thanks.

User ID: 6***55 Norfolk, Canada

Physics

Course Work: 4 Pages, Deadline:
1 day

Excellent work! Because of this site and the professionals who do the work, I received a 100 on the assignment

User ID: 8***20 Norfolk, United States

Physics

Course Work: 4 Pages, Deadline:
1 day

Thank you so much! The work you did helped me to receive a 100 on the assignment.

User ID: 8***20 Norfolk, United States

Assignment

Thesis: 2 Pages, Deadline:
7 days

Thanks to your efforts and well written and researched.Thanks to reaching out before the due time.

User ID: 6***55 Norfolk, Canada

Management

Assignment: 8 Pages, Deadline:
11 days

thank you u guys. i really appreciate your effort, i always happy when purchase with u guys

User ID: 6***24 Norfolk, Australia

Tax

Home Work: 11 Pages, Deadline:
7 days

thank you u guys, even i dont have high marks but i appreciate your efforts . thank you so much

User ID: 6***24 Norfolk, Australia

Audit

Assignment: 2 Pages, Deadline:
3 days

thanks expert, it really a good efforts. Im always happy to let u guys done my assignment/ report

User ID: 6***24 Norfolk, Australia

It Write Up

Assignment: 20 Pages, Deadline:
2 days

excellent, so helpful .Professional writing and good services. all the content is relevant and also provided creative new anaylsis .

User ID: 2***58 Hunters Hill, Australia

Management

Home Work: 3 Pages, Deadline:
2 days

Great job on the Assignment! I will continue to use My Assignment Help in the future.

User ID: 6***97 Hunters Hill, United States

Healthcare

Assignment: 3 Pages, Deadline:
16 days

Excellent paper professor was very pleased and so was I. Nice work on my paper. Keep them coming

User ID: 7***99 Hunters Hill, United States

Statistics

Essay: 3.2 Pages, Deadline:
15 days

Glad I pass the paper. It was of great help. The follow up was excellent on their end. Cheers

User ID: 8***71 Hunters Hill, Singapore

Assignment

Home Work: 3 Pages, Deadline:
4 hours

everything was completed in a timely manner submitted on time s promised i have enjoyed using the services of my assignments

User ID: 7***73 Hunters Hill, United States

Audit

Home Work: 1 Page, Deadline:
2 days

Thanks expert, i got 12/15 for this quiz. I really appreciate for it. Thank you so much

User ID: 6***24 Hunters Hill, Australia

Management

Home Work: 6 Pages, Deadline:
15 hours

I was able to meet deadline because i relied on myassignmenthelp.com, i had the best mark among students who submitted their work for making

User ID: 2***85 Hunters Hill, Ghana

Management

Home Work: 6 Pages, Deadline:
15 hours

I was so excited when I was announced to be the best among students who submitted their work for making

User ID: 2***85 Hunters Hill, Ghana

Marketing

Assignment: 6 Pages, Deadline:
4 days

i got passed in this project. thank you very much for your help. im happy i didnt need to explain much about assgnment brief.

User ID: 8***40 West drayton, Great Britain

Economics

Programming: 1 Page, Deadline:
7 days

Awesome work. you guys helped me on-time. which helped me a lot and i got very good grade on my course and i am really happy.Thanks for your help

User ID: 2***33 Norfolk, United States

Healthcare

Assignment: 3 Pages, Deadline:
3 days

I need the references beside the article not numbered. please kindly review. THANKS.

User ID: 3***25 Norfolk, United States

Assignment

Thesis: 8 Pages, Deadline:
2 days

I appreciate the hard work in this. I got a good grade and will be using this again. Thank you!

User ID: 8***19 Norfolk, United States

Statistics

Assignment: 0 Pages, Deadline:
2 days

Great work and fantastic job on completing the assignment. You did a wonderful job and I am thankful.

User ID: 4***64 Norfolk, United States

Psychology

Assignment: 2 Pages, Deadline:
16 days

thanks to reaching out fast. It’s well written and followed every details and instructions. thanks.

User ID: 6***55 Norfolk, Canada

Physics

Course Work: 4 Pages, Deadline:
1 day

Excellent work! Because of this site and the professionals who do the work, I received a 100 on the assignment

User ID: 8***20 Norfolk, United States

Physics

Course Work: 4 Pages, Deadline:
1 day

Thank you so much! The work you did helped me to receive a 100 on the assignment.

User ID: 8***20 Norfolk, United States

Assignment

Thesis: 2 Pages, Deadline:
7 days

Thanks to your efforts and well written and researched.Thanks to reaching out before the due time.

User ID: 6***55 Norfolk, Canada

Management

Assignment: 8 Pages, Deadline:
11 days

thank you u guys. i really appreciate your effort, i always happy when purchase with u guys

User ID: 6***24 Norfolk, Australia

Tax

Home Work: 11 Pages, Deadline:
7 days

thank you u guys, even i dont have high marks but i appreciate your efforts . thank you so much

User ID: 6***24 Norfolk, Australia

Audit

Assignment: 2 Pages, Deadline:
3 days

thanks expert, it really a good efforts. Im always happy to let u guys done my assignment/ report

User ID: 6***24 Norfolk, Australia

It Write Up

Assignment: 20 Pages, Deadline:
2 days

excellent, so helpful .Professional writing and good services. all the content is relevant and also provided creative new anaylsis .

User ID: 2***58 Hunters Hill, Australia

Management

Home Work: 3 Pages, Deadline:
2 days

Great job on the Assignment! I will continue to use My Assignment Help in the future.

User ID: 6***97 Hunters Hill, United States

Healthcare

Assignment: 3 Pages, Deadline:
16 days

Excellent paper professor was very pleased and so was I. Nice work on my paper. Keep them coming

User ID: 7***99 Hunters Hill, United States

Statistics

Essay: 3.2 Pages, Deadline:
15 days

Glad I pass the paper. It was of great help. The follow up was excellent on their end. Cheers

User ID: 8***71 Hunters Hill, Singapore

Assignment

Home Work: 3 Pages, Deadline:
4 hours

everything was completed in a timely manner submitted on time s promised i have enjoyed using the services of my assignments

User ID: 7***73 Hunters Hill, United States

Audit

Home Work: 1 Page, Deadline:
2 days

Thanks expert, i got 12/15 for this quiz. I really appreciate for it. Thank you so much

User ID: 6***24 Hunters Hill, Australia

Management

Home Work: 6 Pages, Deadline:
15 hours

I was able to meet deadline because i relied on myassignmenthelp.com, i had the best mark among students who submitted their work for making

User ID: 2***85 Hunters Hill, Ghana

Management

Home Work: 6 Pages, Deadline:
15 hours

I was so excited when I was announced to be the best among students who submitted their work for making

User ID: 2***85 Hunters Hill, Ghana

Marketing

Assignment: 6 Pages, Deadline:
4 days

i got passed in this project. thank you very much for your help. im happy i didnt need to explain much about assgnment brief.

User ID: 8***40 West drayton, Great Britain

Economics

Programming: 1 Page, Deadline:
7 days

Awesome work. you guys helped me on-time. which helped me a lot and i got very good grade on my course and i am really happy.Thanks for your help

User ID: 2***33 Norfolk, United States

Healthcare

Assignment: 3 Pages, Deadline:
3 days

I need the references beside the article not numbered. please kindly review. THANKS.

User ID: 3***25 Norfolk, United States

Have any Query?

The post BN205 Project Management:Ethical Decision Making Framework appeared first on My Blog.

✍️ Get Writing Help